Widening & Strengthening of Ambari Sahudangi Road

In this project 2.6 km. stretch has been constructed for widening of the existing road to 5.5m wide with 1.5 m shoulder of each side. After construction of this road an alternate route from eastern bypass to Jalpaiguri has been provided. Besides, rural hats like Ambari hat and Sahudangi hat with various rural settlements in Binnaguri and Shimulguri mouzas has been connected with this road.
 

 

Dr. B.R. Ambedkar & Shahid Kshudiram Basu Bipanan Kendra

In this project there are office floors in each block. The first block, named after Dr B.R. Ambedkar has got total office floor area of 1713.4 sqm and the second block, named after Sahid Khudiram has got total office floor area of 844 sqm. There are provisions of separate access for Office floors and parking place at the ground floor.
 

<< Back

DCRPD Cum Commercial Complex, Jalpaiguri

District Centre for Rehabilitation of the Persons with Disabilities is being established at Jalpaiguri. Establishment of DCRPD is one major initiative of the Govt. of India to commence rehabilitation service at the district level, through out the country. The ideology behind this is on convergence with the activities of the Departments optimal utilization of resources jointly towards better rehabilitation
 

 

Bhaktinagar Connector

This road is the main approach to the Eastern Bye Pass. By constructing this road the movement of heavy vehicles through the Don Bosco connector in which many schools etc. exist have been reduced.

The length of the road is 2.4 KM with 5.5 M as black top and 2.05 M earthen flanks on each side

 

<< Previous || Next >>

 

 

Important Links
Tender & Notices
News & Events
Advertisements
Commercial Projects
New Projects
Dowloads

 
 


All rights reserved [Siliguri Jalpaiguri Development Authority]. Best viewed in IE 5.5+ with 1024 x 768 resolution.
Created & Cared by Techno Developers Group.